| Projects | Vessel Type | Remark |
|---|---|---|
| JASCON H-7009 (December’ 2005 to June’ 2006) |
5150HP Utility / Supply Vessel | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| JASCON H-7010 (December’ 2005 to June’ 2006) |
5150HP Utility / Supply Vessel | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| JASCON H-7020 April’ 2007 to October’ 2007 |
5150HP Utility / Supply Vessel AHTS 34 Men Accommodation | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| JASCON H-7021 April’2007 to October’ 2007 |
5150HP Utility / Supply Vessel AHTS 34 Men Accommodation | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| H-7027 July’2007 to October’ 2009 |
5150HP Utility / Supply Vessel AHTS 34 Men Accommodation | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| H-7028 July’2007 to October’ 2009 |
5150HP Utility / Supply Vessel AHTS 34 Men Accommodation | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| H-7037 (Job Ref : 2491) April’ 2008 to October’ 2009 |
74.87m Anchor Handling / Supply Vessel | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| H-7038 (Job Ref : 2492) April’ 2009 to February’ 2010 |
74.87m Anchor Handling / Supply Vessel | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| H-7040 (Job Ref : 2610) April’ 2009 to February’ 2010 |
79.64m Anchor Handling / Supply Vessel | Install of BIP wall panels, ceilings modular toilet, cosmo marine doors, deckrete underlayment, Polyflor deck covering, rock wool insulation, galley/laundry equipments & furniture. |
| Projects | Vessel Type | Remark |
|---|---|---|
| Ferry Fast (Aluminium) September’2007 to November’2007 |
120 Men Accommodation | Supply & install of BIP wall panels, TNF ceiling deckrete underlayment, rock wool insulation & furniture. |
| Tug Boat 819 February’2008 to April’ 2008 |
Tug Boat | Supply & install of BIP wall panels, TNF ceiling deckrete underlayment, rock wool insulation & furniture. |
| H–856 & H-857 February’2014 to June’ 2014 |
26.7M PATROL BOAT | To Supply & install honeycomb wall panel, ceiling panel, deck covering, doors & stainless steel honeycomb furniture. |
| H–854 & H-855 April’2014 to June’ 2014 |
40.5M CREW BOAT | To Supply & install honeycomb wall panel, ceiling panel, deck covering, doors & stainless steel honeycomb furniture. |
| Projects | Vessel Type | Remark |
|---|---|---|
| Tug Boat September’2006 to Desember’2006 |
Tug Boat | Supply & install of BIP wall panel, TNF ceiling deckrete underlayment, rock wool insulation. |
| H-924 (ASL HARMONY) | 65.5M ROV SUPPORT VESSEL | Install of staco wall panel, ceiling, modular toilet, marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, galley/laundry equipment and furniture. |
| H-1074, H-1075, AND H-1076 November’2013 to January’ 2014 |
59M MULTI-PURPOSE OFFSHORE SUPPORT VESSEL | Install of staco wall panel, ceiling, modular toilet, marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, galley/laundry equipment and furniture. |
| FSO “FEDERAL II” May’2013 to October’ 2013 |
232.042M OIL TANKER FSO “FEDERAL II” | Remove and re-install of staco wall panel, ceiling, modular toilet, marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, galley/laundry equipment and furniture. Vessel insulation installatuion. |
| Projects | Vessel Type | Remark |
|---|---|---|
| KERISI-CPP LIVING QUARTERS (LQM) | 30 MEN ACCOMODATION CPP LQ + MODULE | Install of BIP wall panel, TNF ceiling, Alvedoor marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, microtac raised floor system, reflex-o gym equipment, recreation equipment and furniture. |
| TUNU FIELD DEV. PROJECT PHASE 11 | NORTH COMPRESSION PLATFORM & NORTH MANIFOLD PLATFORM | Install of BIP wall panel, TNF ceiling, Alvedoor marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, TATE raised floor system, RAPP BOMEK door and furniture. |
| GAJAH BARU CPP | LIVING QUARTER | Install of BIP wall panel, TNF ceiling, marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, raised floor system, marine door and furniture. |
| Projects | Vessel Type | Remark |
|---|---|---|
| NORTH BELUT CPP | MODULE | Install of BIP wall panel, ceiling, marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, decatex underside protective coat and furniture. |
| KIPPER TUNA TURRUM PROJECT | MODULE | Install of BIP wall panel, ceiling, RAPP BOMEK external marine door, deckrete underlayment, polyflor deck covering, rockwool insulation, galley/laundry equipment & furniture. |
| Projects | Vessel Type | Remark |
|---|---|---|
| SWIBER SLB-2 | 160M SUBMERSIBLE, TRANSPORT, FLOATOVER & LAUNCH BARGE | Install wall panel, ceiling panel, deck covering & wooden furniture. |
| Projects | Vessel Type | Remark |
|---|---|---|
| YAMAL LNG BATCH 1 August’ 2015 to September’ 2015 |
MODULE | Manpower supply for Architectural installation works. |
| YAMAL LNG BATCH 2 February’ 2016 to April’ 2016 |
MODULE ESS 002, ESS 003, ESS 700, ESS 034, AND ESS 035. | Supply & Install pipe insulation package, Pittsburgh corning foamglas/cellular insulation coated with Hydrocal B-11 anti abrasive on the inner surface, Jacketing with AISI SS316L and accessories such as SS316L Blind Rivet, SS316L Self Tapping Screw c/w Neoprene Rubber. Armaflex foam pipe insulation for copper pipe system. |
| YAMAL LNG BATCH 3 December’ 2015 to August’ 2016 |
MODULE LNG STORAGE 2 SUBSTATION ESS 031 | Architectural works install of fire rating insulation, intermediate floor, Bellypan with supporting & fixtures, 150mm thk sandwich panel, internal & external door. Supply & install 12 mm thk Gypsum board liner with supporting framing and fixtures, Bergvik Raised Floor (ISO Floor Compact). |
| July’ 2016 to August’ 2016 | MODULE ESS 103, ESS 104, ESS 032, AND ESS 600. | Supply & Install pipe insulation package, Pittsburgh corning foamglas/cellular insulation coated with Hydrocal B-11 anti abrasive on the inner surface, Jacketing with AISI SS316L and accessories such as SS316L Blind Rivet, SS316L Self Tapping Screw c/w Neoprene Rubber. |
| Projects | Vessel Type | Remark |
|---|---|---|
| Ghana OCTP Development Project June’ 2016 to August’ 2016 |
JN1186 PERSONNEL PROTECTION | Supply & Install pipe protection package, SS316L Perforated Sheet 1mmThk x 5mm hole with 8mm Pitch, SS316L Plate, 1220mm x 2440mm x 2mmThk (For Support) and Accessories : Ceramic Fiber non asbestos, SS Band & SS Seal, Pop Rivet, Toggle Clip. |
| QCLNG Upstream Project | JN1192 Piping and Gas Heat Exchanger Insulation Work | Supply & Install Pipe Insulation for Acoustic Insulation, Cold Insulation and Personnel Protection. POLYURETHANE FOAM DENSITY 35 KG/M3 Aluminium Alloy 3003/H-14 to ASTM B209 with moisture barrier Jacket Rocktech Maritime wirematts 100kg 50mm SS304 Plate 1.2mm Thk for AI Jacket SS316 Perforated 1mmT x 5mm hole x 8mm pitch SS316 Plate 1mmThk for Insulation Support SS316 Band, Toggle Clip, and Silicone. |